|
|
|
The lift has been installed and works great. Freedom Lift of Traverse City has installed the lift to the lower level. The Master closet shelving has been completed. A view of the columns at the hall. Another view. The den mantel and cabinets. The fireplace in the living room. The handrail at the entry. The columns match the hall. The tile at the tub is also complete.
|
|
|