Framing 11-15

Home
Back


The framing of the new addition has started with the floor deck and main floor walls.

frederiksen - framing 1 - 11-15-03

This is the walkout side of the house.

Frederiksen - framing 2 11-15-03   Frederiksen - framing 6 11-15-03    Frederiksen - framing 5 11-15-03

From the lakes edge you can see the addition and the existing home.

Frederiksen - framing 4 11-15-03    Frederiksen - fraiming 3 11-15-03    Frederiksen - framing 7 11-15-03

  The main floor living room walls will be close to 13'-0" tall. 

Frederiksen - framing 10 11-15-03    Frederiksen - framing 8 11-15-03    Frederiksen - framing 9 11-15-03

The step down into the living room from the entry will add a great feel as you walk into the house.

Frederiksen - framing 11-15-03


WoodCraft Home Page