|
|
|
The interior trim is almost complete. The entry tile is installed. The ceramic tile shower is underway. The fireplace mantel is in place and ready to be stained. Another view of the fireplace. The trim at the craft room is in and looks nice. The view to the den. The trim around the round top window at the second floor. The exterior siding is almost complete. The end view. The gable details will be placed in a few days. A view from the lake. It looks great from the lake side.
|
|
|