Apr. 10, 02

Home
Back


Campbell-kitchen1-4-10-02.jpg (890050 bytes)Campbell-kitchen2-4-10-02.jpg (888220 bytes)Campbell-kitchen3-4-10-02.jpg (863973 bytes)Campbell-master2-4-10-02.jpg (875684 bytes)Campbell-master-4-10-02.jpg (889485 bytes)

Campbell-mech-4-10-02.jpg (882136 bytes)Campbell-bedroom-4-10-02.jpg (920374 bytes)Campbell-door trim-4-10-02.jpg (850104 bytes)Campbell-hall-4-10-02.jpg (925711 bytes)Campbell-island-4-10-02.jpg (933226 bytes)

The countertops are placed at the kitchen and most of the doors have been trimmed.  The ceramic tile is being  completed in the bathrooms along with the slate floor at the master bath.