|
|
|
We have started the framing of the exterior decks. Part of the material that will be used on the house. The bathroom at the lower level is framed. The deck at the screen porch area. The deck at the front of the house. The front wall of the house has been moved out. The guys. The interior looking towards the lake. The insulation is existing. Another view.
|
|
|