March 2, 2003 - Drywall:  The drywall has started to be hung in the house.  It will take about 3 days to completely hang the drywall on the ceilings and the walls.  After the board is up the finishing crew will come in and mud the walls.

Montgomery-bonusrm-drywall-3-    Montgomery-bridgedrywall1    Montgomery-upperdrywall2

The Bonus room is now Bedroom #3.

Montgomery-dining1

The 48" wide dining room table will fit between the slider and the cabinets at the dining room.  this leaves about 2'-9" between the edge of the countertop and the sliding door.

Montgomery-drywall1    Montgomery-drywall2    MOntgomery-drywall3    Montgomery-drywall4

The drywall is almost complete at the lower level.

Montgomery-loftdrywall2    Montgomery-loftdrywall3    Montgomery-loftview-3

The upper level is all hung and we are waiting for the finishers to come in and mud the walls and the ceilings.

Montgomery-upperdrywall1    Montgomery-upperdrywall3

Montgomery-soffitt1

The exterior siding and colors are starting. The vented soffit is being installed at this time.  The siding will start after the soffit and the fascia have been completed.

 