We have started the project and it is time for the protection of the existing floor covering. We place a layer of sticky visqueen over it so the amount of dirt that gets on the carpet is minimized. This is a view of the main floor entry. Another view. The stairs to the lower level are also done. This is the kitchen area. We have framed the walls so that we can insulate them and get the area ready for cabinets. This is the view from the media room thru the dining room to the kitchen. This is the closet at the bathroom. Note that there will be a "cubby" area at the left side of the bath closet. A view of the pantry closet. This is the top of the shower unit in the bathroom. This is the closet at the right side of the dining room area. Check back next week for more detail on the finish of the plan.
|
|
|