We have started the demolition of the interior of the house. This is one of the bedrooms that we have removed the paneling at the wall that was leaking. All of the existing insulation is "kraft" (paper) faced. The closet has been removed and the carpet has been pulled up. This is Jeff and Bob Stone. They are a part of what make the jobs tick. This is the view from the entry to the lower level door. A view of the kitchen. Another view of the entry at the stair. The bottom of the hearth stone. This has a huge buildup of mold and mildew. Unfortunately......This is something that will not be able to be saved. Another view of the mold that is on the carpet and the bottom of the particle board base. The top side of the hearth. The carpet has been removed at the lower level also. Another view.
The entry stairs are being removed for the new entry.
Pulling the boards off the ceiling. This is Dick Stone. Yes that is right......we have (3) Stones working for us. Check out the site next week. We will have other pictures of the demolition and the starting of the framing.
|
|
|