March 15, 02

Home
Back


Campbell-bath.1-3-15-02.jpg (867170 bytes)Campbell-bath.2-3-15-02.jpg (816433 bytes)Campbell-bath.4-3-15-02.jpg (755777 bytes)Campbell-bath.5-3-15-02.jpg (853843 bytes)Campbell-bath.6-3-15-02.jpg (876648 bytes)

Campbell-ceiling.2-3-15-02.jpg (861205 bytes)Campbell-ceiling.3-3-15-02.jpg (917095 bytes)Campbell-ceiling.4-3-15-02.jpg (918569 bytes)Campbell-ceiling.5-3-15-02.jpg (909604 bytes)

Campbell-crawl.1-3-15-02.jpg (816833 bytes)Campbell-doors.1-3-15-02.jpg (880713 bytes)Campbell-hall.1-3-15-02.jpg (835451 bytes)Campbell-kitchen.1-3-15-02.jpg (812790 bytes)

Campbell-kitchen.2-3-15-02.jpg (902277 bytes)Campbell-kitchen.3-3-15-02.jpg (884686 bytes)Campbell-master.1-3-15-02.jpg (909756 bytes)Campbell-porch.1-3-15-02.jpg (918842 bytes)

We are in the middle of the trim stage on the project at this time.  The ceramic tile is being placed in the areas as designed and the wood flooring has been finished.