May 5, 2003 - Finishing Details:  We are getting close to the end of the project.  The cabinets are in and we are waiting on the countertops.  The painting of the trims will begin in the next day or two.

Montgomery-bench1-    Montgomery-bench2    Montgomery-bench3

The bench at the entry is almost complete.

Montgomery-cabinets2    Montgomery-cabinets1

The maple cabinets in the kitchen add a nice contrast.

Montgomery-drainage1    Montgomery-drainage2    Montgomery-drainage3

We have installed the balance of the drainage system to the lake.

Montgomery-detail-5    Montgomery-fireplace1    Montgomery-fireplace2-

The fireplace trims are complete.

Montgomery-loftbench2    Montgomery-loftbench3    Montgomery-loftbench1

The bench at the loft has been completed........

Montgomery-rail3    Montgomery-railing1    Montgomery-rail4-    Montgomery-rail2-

.......as have the rails and details.

Montgomery-lakeside1    Montgomery-lakeside2-    Montgomery-entryside-5