The columns are installed. The bottom of the columns will be completed when the patios are completed. The detail at the top of the entry columns. Wells are placed at each of the vent locations around the new foundation. The electrical is for the landscape lighting. We have received all the inspection approvals and the wall insulation has been completed. The blue material are vents that allow the roof to breath.
|
|
|