Nov. 9-01

Home
Back


The exterior of the cottage is being sealed at this time.

The new garage door has been installed as you can see.

The sheets are covering the windows as the sealing is taking place.

The vinyl and the tile have been installed and look great.

The lower level drywall is on and ready for paint.

The hearth tile is installed.

...as well as the kitchen tile.

The cedar at the interior of the porch has started to be installed.